# Capstone - Synthetic Infrastructure Project

Create a controlled digital workflow for:
- road corridor
- earthworks platform
- drainage route
- survey / as-built QA
- one AI-assisted engineering tool concept

Required evidence:
1. Source register
2. Missing-information register
3. Model-build plan
4. Road QA checklist
5. TIN/formation specification
6. Drainage gradient schedule
7. Machine-control issue checklist
8. Design-vs-as-built comparison
9. Tool PRD and test cases
10. Five-slide technical presentation

All data is synthetic training data.
